Description
What it does
Bags finished snap pops in OPP film, one pack at a time.
Before you order
Confirm the pack count and the bag size you run. Changeover time between counts is worth asking about.
Where it sits in the line
Stage 2 of the Snap Pop Line: Packing.
What it produces
9,600 bag per 8 hour shift, 211,200 per month.
Calculated from the factory’s rated output of 1 bag per 3 seconds, on one 8 hour shift and 22 working days. No allowance for changeover or downtime.
Quoted to specification. Machines are built to your product, volume and destination. Send us your requirement and we will quote the machine or the complete line.





