Description
What it does
Raises and lowers the loaded plates through the dipping bath so the coating builds evenly.
Before you order
Match the lift to the plate size and the case depth you run.
Where it sits in the line
Stage 4 of the Sparkler Line: Dipping.
What it produces
2,400 plate per 8 hour shift, 52,800 per month.
Calculated from the factory’s rated output of 12sec/plate, on one 8 hour shift and 22 working days. No allowance for changeover or downtime.
Quoted to specification. Machines are built to your product, volume and destination. Send us your requirement and we will quote the machine or the complete line.






