Description
What it does
Prepares the delay fuse that sets the time between the lift and the break.
Before you order
Confirm the fuse diameter and the cut length tolerance.
Where it sits in the line
Stage 4 of the Display Shell Line: Delay fuse.
What it produces
14,400 pcs per 8 hour shift, 316,800 per month.
Calculated from the factory’s rated output of 2sec/pcs, on one 8 hour shift and 22 working days. No allowance for changeover or downtime.
Quoted to specification. Machines are built to your product, volume and destination. Send us your requirement and we will quote the machine or the complete line.