Description
What it does
Inserts or fills fuse into each tube in a bundle in one cycle.
Before you order
Fuse diameter and tube size must both be confirmed. Send a fuse sample if the specification is unusual.
Where it sits in the line
Stage 5 of the Cake Line: Fusing.
What it produces
1,440 bundle per 8 hour shift, 31,680 per month.
Calculated from the factory’s rated output of 20sec/bundle, on one 8 hour shift and 22 working days. No allowance for changeover or downtime.
Quoted to specification. Machines are built to your product, volume and destination. Send us your requirement and we will quote the machine or the complete line.