Description
What it does
Blends dry chemical components to an even mix before pressing or rolling. Mixing time and batch size set the throughput.
Before you order
Composition and batch size drive the specification. State whether the machine will handle break charge, effect composition or both, and whether you need a dedicated unit per composition.
Where it sits in the line
Stage 3 of the Cake Line: Chemical preparation.
What it produces
1,600 kg per 8 hour shift, 35,200 kg per month.
Calculated from the factory’s rated output of 200kg/hour, on one 8 hour shift and 22 working days. No allowance for changeover or downtime.
Quoted to specification. Machines are built to your product, volume and destination. Send us your requirement and we will quote the machine or the complete line.